AMS Nuclear
  • Home
  • About us
  • What we do
  • Case Studies
  • News
  • Careers
  • Contact
Select Page
Gaseous Sampling & Monitoring Cubicle Refurbishment

Gaseous Sampling & Monitoring Cubicle Refurbishment

by yousef-ams-nuclear-admin | Oct 6, 2021 | C&I Systems Engineering, Environmental Sampling

Sampling Gaseous Sampling and Monitoring Cubicle Refurbishment Case Study Ref. AMS-CS-4700569 Type: Sampling Scope of supply: Inspection, Design, Delivery Market Sector: Generating Background The combined particulate and Sulphur 35 (S-35) gaseous discharge monitoring...
B/G/90 Valve Installation

B/G/90 Valve Installation

by yousef-ams-nuclear-admin | Feb 19, 2021 | C&I Systems Engineering

C & I Systems Engineering B/G/90 Valve Installation Type: Obsolescence Scope of Supply: DESIGN ¦ BUILD ¦ SUBSTANTIATE ¦ TEST ¦ INSTALL Client: EDF Energy – Hinkley Point B Key Deliverables: B/G/90 Valve Actuator Control System Project Overview This project...
Gaseous Activity Monitoring (GAM) System – Installation Assistance

Gaseous Activity Monitoring (GAM) System – Installation Assistance

by yousef-ams-nuclear-admin | Feb 19, 2021 | C&I Systems Engineering

C & I Systems Engineering Gaseous Activity Monitoring (GAM) System – Installation Assistance Type: Control & Instrumentation Scope of Supply: SITE SURVEY ¦ INSTALLATION ASSISTANCE Client: EDF Energy – Heysham 1 Key Deliverables: Feasibility/ Design...
Replacement CCR Hardwire Fire Alarm System

Replacement CCR Hardwire Fire Alarm System

by yousef-ams-nuclear-admin | Feb 19, 2021 | Ageing & Obsolescence

Obsolescence Replacement CCR Hardwire Fire Alarm System Type: Obsolescence Scope of Supply: DESIGN, BUILD, TEST, DELIVER, INSTALL, COMMISSION Client: EDF Energy – Hinkley Point B Key Deliverables: Replacement CCR Hardwired Fire Alarm System Project Overview AMS...
Reactor CO2/ O2 Injection System

Reactor CO2/ O2 Injection System

by yousef-ams-nuclear-admin | Feb 19, 2021 | C&I Systems Engineering

C & I Systems Engineering Reactor CO2/ O2 Injection System Type: Control & Instrumentation Scope of Supply: DESIGN ¦ BUILD ¦ TEST Client: EDF Energy – Heysham 1 Key Deliverables: A secondary valve shut off system (Last line of defence) substantiated to...
« Older Entries

Recent Posts

  • AMS Celebrates Project Win at Hinkley Point C
  • Engineering the Nuclear Future with AMS
  • AMS’ Journey to Net Zero
  • Gaseous Sampling & Monitoring Cubicle Refurbishment
  • AMS Change Name & Address

Archives

  • January 2025
  • July 2024
  • June 2024
  • October 2021
  • April 2021
  • March 2021
  • February 2021
  • December 2020
  • October 2020
  • July 2020
  • March 2020
  • September 2019
  • March 2019
  • February 2019
  • December 2018
  • May 2018
  • September 2017
  • July 2016

Categories

  • Ageing & Obsolescence
  • C&I Systems Engineering
  • Environmental Sampling
  • From 2019
  • HOME NEWS
  • News
  • Pneumatics
  • Uncategorised
  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

About us

C&I Systems Engineering

Environmental Sampling

Ageing & Obsolescence

News

Case Studies

Careers

Privacy Policy

AMS Nuclear Engineering Ltd

1604-1605 Carnival Way,

North Petherton, Bridgwater,

Somerset, TA6 6GY

+44 (0)1278 444650 [email protected]

+44 (0)1278 444 650

[email protected]

©AMS Nuclear Engineering Ltd 2021 Company No. 03750828 - Registered in England & Wales.

  • Facebook
  • X
  • RSS

Whos theme My Theme | Powered by MyPress | Designed by Your Design Agency