AMS Nuclear Logo icon

Project Overview

Type: C&I Systems Engineering

Scope Of Supply: Site Survey, Optioneering, Design, Installation, Commissioning

Market Sector: Decommissioning

Maintaining reliable site-wide communications is essential throughout nuclear decommissioning, particularly when existing infrastructure must be removed to accommodate demolition works. The challenge is replacing critical systems without disrupting operational communications, while making effective use of existing equipment and infrastructure.

AMS Nuclear provides end-to-end engineering solutions that combine modern technology with the refurbishment and integration of legacy assets, delivering maintainable systems with minimal disruption to site operations.

At Hinkley Point A, NRS required a replacement Public Address (PA) system as part of the Turbine Hall Decommissioning Project, with much of the existing equipment located in areas scheduled for demolition. AMS Nuclear developed a comprehensive survey, design, build, installation and commissioning solution for a distributed digital radio-based PA system. The proposed system incorporated 12 operational fixed outstations, 15 mobile outstations, eight handheld receivers and two operator consoles, alongside system health monitoring and a defined spares provision. By reusing suitable existing equipment and planning a phased changeover with both systems operating in parallel, AMS Nuclear established an approach designed to maintain communication coverage, minimise intrusive works and support the site’s evolving decommissioning requirements.

Maintaining Critical Communications in a Changing Site Environment

Overcoming Infrastructure Constraints Without Disrupting Operations

Public Address Receiver Fixed Unit

“We needed a solution that would adapt to the site, not the other way around. That meant understanding what we could reuse, what we had to redesign and how to keep the system live throughout.”

Project Lead, AMS Nuclear

Engineering a Flexible, Radio-Based Communication Solution

Delivering a Controlled Transition with Zero Loss of Coverage

Understanding the Site Through Detailed Survey

Designing and Building with Quality at the Core

Installing Without Interrupting Operations

Completing and Supporting the Transition

Innovation Through Adaptation and Reuse

AMS Nuclear Certifications

ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
Cyber Essentials