AMS Nuclear Logo icon

Project Overview

Client: EDF Energy – Hinkley Point B

Type: Obsolescence

Scope Of Supply: Design, Build, Test, Deliver, Install, Commission

Key Deliverables: Replacement CCR Hardwired Fire Alarm System

At Hinkley Point B, the Central Control Room (CCR) alarm system plays a critical role in enabling operators to respond effectively to plant conditions. To support continued compliance, improve long-term reliability, and ensure alignment with modern engineering standards, AMS Nuclear delivered a fully integrated replacement of the hardwired alarm system.

Through a design, manufacture and qualification programme delivered under QA Grade 2, AMS Nuclear provided a modern, maintainable solution that seamlessly integrates with existing infrastructure. The upgraded system enhances alarm reliability, supports operator clarity and ensures full compliance with EDF technical standards – ultimately strengthening operational continuity and providing a robust platform for ongoing station lifecycle management.

Operating Within a Safety-Critical Environment with Evolving Lifecycle Demands

Engineering a Like-for-Like Yet Forward-Looking Solution

“This was about delivering certainty, ensuring the new system performs exactly as expected, while giving the station confidence in its long-term reliability.”

Project Lead, AMS Nuclear

Delivering with Assurance: A Controlled and Compliant Implementation

Creating a Repeatable Approach for Fleet-Wide Modernisation

A Trusted Partner in Safety-Critical System Modernisation

AMS Nuclear Certifications

ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
Cyber Essentials