Modernising Legacy Process Control: PM2 Control System Replacement

The legacy ABB Advant AC450 control system at St Cuthbert’s Mill was replaced with a modern PLC and SCADA platform to improve long-term reliability.

Nitrogen Plant Interface Cubicles

EDF Energy – Dungeness B

AMS’ scope was to utilise the existing controls and indications within the CCR whilst providing an interface which allows the controls and indication to operate with either the old or new plant

Restoring Reliability to a Critical Fuel Route System: Designing and delivering a modern pneumatic control panel for long-term operational resilience 

Hinkley Point B’s ageing IFD pneumatic panel was replaced with a modern, fully documented solution to restore reliable long-term operations.

Modernising Alarm Annunciation to Secure Long-Term Operational Reliability 

A legacy alarm annunciation system at Hinkley Point A’s PWTP was replaced with a modern, fully integrated solution, improving long-term reliability.

Delivering Resilient Site-Wide Communications During Decommissioning at Hinkley Point A 

A radio-based PA system replaced ageing infrastructure at Hinkley Point A during decommissioning, maintaining uninterrupted site-wide communications.