Remote CO₂ Isolation Valve Upgrade At Hinkley Point B

EDF Energy – Hinkley Point B

This project involved the design of a modification to a manual valve to provide automatic operation of the valve to overcome the potential local hazards which could prevent isolation of the system if a seismic event were to occur.

Enabling Safe, Compliant Integration of a New GAM System at Heysham 1 

Specialist EC&I support at Heysham 1 enabled safe integration of a new Gaseous Activity Monitoring system without disrupting reactor operations.

Heysham 1 Nuclear Power Station
Delivering Safe Oxygen Injection to Restore Reactor Performance at Heysham 1 

An oxygen injection monitoring system at Heysham 1 safeguards reactor coolant, preventing fuel cladding failure with fleet-wide applicability.

Delivering Verified EMI/RFI Resilience for Safety-Critical Systems at Hinkley Point B 

EMI/RFI upgrades at Hinkley Point B improved cabinet shielding and bonding across nuclear control systems, validated through formal type testing.

Enabling Reliable Reactor Control Through Targeted Engineering Support 

EDF Energy – Dungeness B

AMS evaluated the proposed EDF concept design and expanded the concept whilst working closely with the site engineers to ensure the system was fit for purpose and compatible with existing infrastructure.

Modernising Legacy Process Control: PM2 Control System Replacement

The legacy ABB Advant AC450 control system at St Cuthbert’s Mill was replaced with a modern PLC and SCADA platform to improve long-term reliability.

Restoring Reliability to a Critical Fuel Route System: Designing and delivering a modern pneumatic control panel for long-term operational resilience 

Hinkley Point B’s ageing IFD pneumatic panel was replaced with a modern, fully documented solution to restore reliable long-term operations.

Modernising Alarm Annunciation to Secure Long-Term Operational Reliability 

A legacy alarm annunciation system at Hinkley Point A’s PWTP was replaced with a modern, fully integrated solution, improving long-term reliability.

Delivering Resilient Site-Wide Communications During Decommissioning at Hinkley Point A 

A radio-based PA system replaced ageing infrastructure at Hinkley Point A during decommissioning, maintaining uninterrupted site-wide communications.