C&I Overlay System

Following the final shutdown and defuelling of Hinkley Point ‘A’, AMS delivered a new and separate C&I ‘overlay’ system to meet the plants monitoring and communication needs for the next phase of decommissioning.

PA System Replacement

The Public Address (PA) system at Hinkley Point ‘A’ was suffering the effects of ageing and obsolescence. AMS were contracted to conduct an optioneering study and to ultimately implement a replacement system.

PCB Reverse Engineering

When an old piece of instrumentation became obsolete, AMS reverse engineered the PCB enabling the client to avoid the costly exercise of qualifying a new piece of equipment for the application.

Instrument Cubicles

As part of a boiler lifetime modification program, AMS were engaged by the client to design, substantiate, build, test and deliver a suite of instrument cubicles to support a risk reduction initiative to meet the station’s Safety Case.