Gaseous Sampling & Monitoring Cubicle Refurbishment
The particulate and sulphur 35 (S-35) gaseous discharge monitoring panels at Hinkley Point B required upgrades.
AMS Change Name & Address
Back in April 2019, A.M. Sensors Limited completed the first phase of a rebranding exercise, adopting the logo seen on this website to better communicate the company’s evolution into a solely nuclear focused C&I company.
AMS Migrate to ISO 45001
AMS Nuclear Engineering (AMS) are pleased to announce that they have successfully achieved the transition to ISO 45001:2018, the world’s first global health and safety management system.
AMS Complete Move to New Premises
AMS are pleased to announce that we have completed our move into new premises at the Bridgwater Gateway development in Bridgwater, Somerset.
AMS Achieve Cyber Essentials Accreditation
AMS are pleased to announce that they have successfully achieved accreditation for Cyber Essentials.
B/G/90 Valve Installation
EDF Energy – Hinkley Point B
This project involved the design of a modification to valve B/G/90 to provide automatic operation of the valve to overcome the potential local hazards which could prevent isolation of the system if a seismic event were to occur.
Gaseous Activity Monitoring (GAM) System – Installation Assistance
EDF Energy – Heysham 1
To assess the interface feasibility and detailed design which will be required prior to the installation of the new fleet wide Gaseous Activity Monitoring (GAM) system.
Replacement CCR Hardwire Fire Alarm System
EDF Energy – Hinkley Point B
AMS provided a detailed design for a replacement hard wired fire alarm system for Hinkley Point B Nuclear Power Station.
Reactor CO2/ O2 Injection System
EDF Energy – Heysham 1
AMS designed, built, tested, delivered and site tested a flow monitoring and valve control panel for the oxygen injection system to be used at Heysham 1 power station
Superheater Overpressure Instrumentation Replacement
EDF Energy – Dungeness B
AMS was tasked to find a suitable modern replacement for the two signal isolators and the power supply based upon an item equivalency evaluation.