B/G/90 Valve Installation
EDF Energy – Hinkley Point B
This project involved the design of a modification to valve B/G/90 to provide automatic operation of the valve to overcome the potential local hazards which could prevent isolation of the system if a seismic event were to occur.
Gaseous Activity Monitoring (GAM) System – Installation Assistance
EDF Energy – Heysham 1
To assess the interface feasibility and detailed design which will be required prior to the installation of the new fleet wide Gaseous Activity Monitoring (GAM) system.
Replacement CCR Hardwired Fire Alarm System
EDF Energy – Hinkley Point B
AMS provided a detailed design for a replacement hard wired fire alarm system for Hinkley Point B Nuclear Power Station.
Reactor CO2/ O2 Injection System
EDF Energy – Heysham 1
AMS designed, built, tested, delivered and site tested a flow monitoring and valve control panel for the oxygen injection system to be used at Heysham 1 power station
RAETP Alarm Management System
EDF Energy – Heysham 1
The existing RAETP (Radioactive Active Effluent Treatment Plant) alarm panel showed signs of ageing and needed replacing with a new alarm panel with the same functionality and maximum size.
Stator Water Caustic Dosing System
EDF Energy – Heysham 2
Due to chemical control issues with TG7 and 8 stator winding cooling water systems, there became a requirement to improve the pH control within the circuit.
EMI/ RFI Resilience – Surveys, Recommendations & Modifications
EDF Energy – Several Sites
AMS has undertaken detailed site walk downs on some stations and produced optioneering reports providing recommendations for the individual panel modifications to improve cabinet RFI resilience.
Steam Dump Isolation Valve Control System
EDF Energy – Dungeness B
AMS evaluated the proposed EDF concept design and expanded the concept whilst working closely with the site engineers to ensure the system was fit for purpose and compatible with existing infrastructure.
Alternative Indication Centre (AIC) – Scada System Upgrade
EDF Energy – Hinkley Point B
AMS partnered with Servelec Controls (Now ITI) to deliver a new SCADA system that mimics the functionality of the existing system.
Control System Upgrade
St Cuthbert’s Mill
AMS implemented the modifications to the control system and commissioned on site to the client’s satisfaction.
Nitrogen Plant Interface Cubicles
EDF Energy – Dungeness B
AMS’ scope was to utilise the existing controls and indications within the CCR whilst providing an interface which allows the controls and indication to operate with either the old or new plant
IFD Control Room Pneumatic Panel
EDF Energy – Hinkley Point B
AMS undertook a site survey and produced a detailed P&ID of the existing system before completing the detailed design, build, installation and commissioning activities.