Remote CO₂ Isolation Valve Upgrade At Hinkley Point B
EDF Energy – Hinkley Point B
This project involved the design of a modification to a manual valve to provide automatic operation of the valve to overcome the potential local hazards which could prevent isolation of the system if a seismic event were to occur.
Enabling Safe, Compliant Integration of a New GAM System at Heysham 1
Specialist EC&I support at Heysham 1 enabled safe integration of a new Gaseous Activity Monitoring system without disrupting reactor operations.
Securing Long-Term Safety and Operational Confidence Through CCR Alarm Modernisation Replacement CCR Hardwired Fire Alarm System
Hinkley Point B’s hardwired CCR alarm system was replaced to QA Grade 2, preserving operator familiarity and ensuring long-term reliability.
Delivering Safe Oxygen Injection to Restore Reactor Performance at Heysham 1
An oxygen injection monitoring system at Heysham 1 safeguards reactor coolant, preventing fuel cladding failure with fleet-wide applicability.
RAETP Alarm Management System
EDF Energy – Heysham 1
The existing RAETP (Radioactive Active Effluent Treatment Plant) alarm panel showed signs of ageing and needed replacing with a new alarm panel with the same functionality and maximum size.
Maintaining Reliable Generator Cooling Through Precision Chemical Control
A new caustic dosing system at Heysham 2 maintains stator water pH, protecting generator components from corrosion and ensuring reliable operation.
Delivering Verified EMI/RFI Resilience for Safety-Critical Systems at Hinkley Point B
EMI/RFI upgrades at Hinkley Point B improved cabinet shielding and bonding across nuclear control systems, validated through formal type testing.
Steam Dump Isolation Valve Control System
EDF Energy – Dungeness B
AMS evaluated the proposed EDF concept design and expanded the concept whilst working closely with the site engineers to ensure the system was fit for purpose and compatible with existing infrastructure.
Alternative Indication Centre (AIC) – Scada System Upgrade
EDF Energy – Hinkley Point B
AMS partnered with Servelec Controls (Now ITI) to deliver a new SCADA system that mimics the functionality of the existing system.
Modernising Legacy Process Control: PM2 Control System Replacement
The legacy ABB Advant AC450 control system at St Cuthbert’s Mill was replaced with a modern PLC and SCADA platform to improve long-term reliability.
Nitrogen Plant Interface Cubicles
EDF Energy – Dungeness B
AMS’ scope was to utilise the existing controls and indications within the CCR whilst providing an interface which allows the controls and indication to operate with either the old or new plant
Restoring Reliability to a Critical Fuel Route System: Designing and delivering a modern pneumatic control panel for long-term operational resilience
Hinkley Point B’s ageing IFD pneumatic panel was replaced with a modern, fully documented solution to restore reliable long-term operations.