Project Overview

Client: EDF Energy – Hinkley Point B

Type: Obsolescence

Scope Of Supply: Design, Build, Test, Deliver, Install, Commission

Key Deliverables: Replacement CCR Hardwired Fire Alarm System

Maintaining reliable alarm systems is essential to nuclear station operations, but replacing ageing equipment presents a particular challenge: introducing modern, maintainable technology while preserving the established functionality and operator familiarity that control room teams rely on.

AMS Nuclear delivers engineered replacement solutions that retain existing system functionality, integrate with installed infrastructure and support long-term reliability, with minimal disruption to station operations. At Hinkley Point B (EDF Energy), the Central Control Room (CCR) hardwired alarm system required modernisation to address equipment obsolescence and lifecycle requirements.

AMS Nuclear was commissioned to design, manufacture, test and deliver a replacement system under QA Grade 2 requirements, incorporating prototype development, equipment qualification and comprehensive quality assurance. Designed for a minimum 10-year operating life, the replacement equipment was specified to replicate the existing system’s functionality and integrate with established plant interfaces, supporting continued compliance, maintainability and operational confidence.

Operating Within a Safety-Critical Environment with Evolving Lifecycle Demands

Engineering a Like-for-Like Yet Forward-Looking Solution

“This was about delivering certainty, ensuring the new system performs exactly as expected, while giving the station confidence in its long-term reliability.”

Project Lead, AMS Nuclear

Delivering with Assurance: A Controlled and Compliant Implementation

Creating a Repeatable Approach for Fleet-Wide Modernisation

A Trusted Partner in Safety-Critical System Modernisation