AMS Nuclear Logo icon

Project Overview

Client: EDF Energy – Dungeness B

Type: Engineering

Scope Of Supply: Design, Build, Test

Key Deliverables: Delivery of ABDS Logic Cubicles and SRVI Valve Isolation System Cubicles.

The Dungeness B (DNB) boiler lifetime project aims to extend the safe operational life of DNB by mitigating the effects of Boiler Tube Leaks (BTL). The Automatic Boiler Depressurisation System (ABDS) and Reactor Safety Relief Valve Isolation (SRVI) System were two of the three modifications being prioritised for immediate implementation at DNB. This project was the third phase of the ABDS/ SRVI systems to be delivered by AMS and provides the control logic for these two systems.

Why AMS?

The ABDS and SRVI cubicles have been successfully installed in their final locations at Dungeness and AMS has completed the Site Acceptance Testing (SAT) of these logic cubicles and valve isolation system.

AMS have a long and successful project portfolio with EDF Energy (Barnwood); notwithstanding familiarity with EDF procedures and the relevant experience there remains a great deal of trust and understanding between EDF Energy and AMS.

AMS Nuclear Certifications

ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
Cyber Essentials
Fit For Nuclear