Supporting EDF’s Commitment to Safe, Reliable Generation
EDF’s Dungeness B power station, part of the UK’s Advanced Gas-cooled Reactor (AGR) fleet, required modernised instrumentation cubicles as part of its Boiler Lifetime Improvement Programme. These cubicles support the systems that protect and regulate boiler performance — equipment essential to maintaining the station’s safety case and continued operational reliability.
EDF turned to AMS Nuclear for a solution that would not only meet stringent nuclear design and quality requirements but also deliver long-term value. The project demanded precision engineering, seismically qualified equipment and an assured delivery schedule to align with planned outages.
AMS Nuclear delivered a fully compliant, right-first-time solution ahead of programme, supplying 16 instrument cubicles substantiated to Class 2 seismic and environmental qualification standards. The project was completed on time and within budget, enhancing measurement accuracy, maintainability, and lifecycle performance. Designs were substantiated for continued operation through 2028, supporting safe defueling to 2033.