AMS Nuclear Logo icon

Project Overview

Client: St Cuthbert’s Mill

Type: Control & Instrumentation

Scope Of Supply: Design, Build, Commission

Key Deliverables: Replacement of the mill’s main PLC/SCADA system

The existing control system for PM2 at St Cuthbert’s Mill comprised an ABB Advant AC450 controller with 3 operator stations that were no longer supportable. This ageing control system needed to be replaced by a modern PLC/SCADA system, which could be supported both internally by St Cuthberts’ own personnel and by external systems integrators for more complex issues. The system proposed by AMS comprised a Rockwell Automation CompactLogix modular PLC system with a GE Proficy iFIX SCADA system providing the operator interface.

Why AMS?

With previous experience in dealing with the client, AMS implemented the modifications to the control system and commissioned on site to the client’s satisfaction. The new control system is now fully operational and supportable.

AMS Nuclear Certifications

ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
Cyber Essentials
Fit For Nuclear