This project involved the design of a modification to valve B/G/90 to provide automatic operation of the valve to overcome the potential local hazards which could prevent isolation of the system if a seismic event were to occur. AMS also manufactured & assembled an electrical control panel, self-contained UPS system, custom brackets and a pressure transmitter plate assembly.
Project Overview
Client: EDF Energy - Hinkley Point B
Type: Obsolescence
Scope Of Supply: Design, Build, Substantiate, Test, Install
Key Deliverables: B/G/90 Valve Actuator Control System
Why AMS?
AMS’ understanding of the nuclear safety significance of the system proved influential in the decision to award AMS the contract for this EC&I Project.





