AMS Nuclear Logo icon

Project Overview

Client: EDF Energy Nuclear Generation Ltd

Location: Heysham 1

Market Sector: Generating

From Legacy Limitations to Long-Term Assurance

Maintaining reliable gaseous effluent monitoring is essential for nuclear power stations, particularly as environmental requirements evolve and existing equipment approaches the end of its operational life. The challenge is not simply replacing ageing sampling systems, but ensuring new equipment meets current regulatory standards while integrating with existing plant infrastructure. AMS Nuclear designs and builds bespoke particulate and iodine sampling systems that address these requirements, combining specialist instrumentation expertise with rigorous quality assurance, full documentation and long-term maintainability.

At Heysham 1 (EDF Energy), five particulate and iodine sampling cubicles within the Gaseous Effluent Monitoring System required replacement to support compliance with the station’s environmental permit and Best Available Techniques (BAT) requirements. AMS Nuclear delivered a design and manufacture solution for five bespoke sampling cubicles, engineered to BS ISO 2889:2010, Environment Agency Technical Guidance Note M11 and relevant electrical standards.

Working to QA Grade 2 requirements, with Safety Category 2 and Seismic Category 2 assurance, we provided the engineering design, manufacture, testing and documentation, with commissioning support included in our scope. The approach combined site-specific engineering with consistent quality and documentation requirements, providing a basis for future maintenance and similar upgrades across the nuclear fleet.

Meeting Environmental Standards with Ageing Infrastructure

Five Fully Compliant Cubicles Designed for Operational Ease

Designing these systems wasn't just about meeting the spec, it was about giving the client long-term confidence that their sampling integrity is protected for the lifecycle of the plant.

Lead Design Engineer, AMS Nuclear

Structured, Assured and On Track

Five Cubicles. One Integrated Outcome.

  • Echo: R1 Contaminated Vent
  • Foxtrot: R2 Contaminated Vent
  • Golf: Gas Circulator Maintenance
  • Hotel: Fuel Handling Block
  • Juliet: Additional Fuel Storage

Compliance Secured and Confidence Restored

The systems we delivered at Heysham 1 have become a reference point, both for how we solve problems and how we document them.

Project Manager, AMS Nuclear

AMS Nuclear Certifications

ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
Cyber Essentials