AMS Nuclear Logo icon

Project Overview

Client: EDF Energy – Heysham 1

Type: Obsolescence

Scope Of Supply: Design, Build, Test, Commission

Key Deliverables: Replacement of RAETP Alarm Management System

Replacing ageing alarm panels requires careful consideration of the proven logic, operator familiarity and plant interfaces that support day-to-day operation. AMS Nuclear combines modern technology with established system principles to improve long-term maintainability, manage obsolescence and minimise changes on site.

At EDF Energy’s Heysham 1, AMS Nuclear delivered the complete replacement of the Radioactive Effluent Treatment Plant (RAETP) alarm panel, from initial survey and design through manufacture, testing, installation and commissioning.

Engineered to British, European and EDF standards and the requirements of the Category 3 Nuclear Safety Case, the replacement retained the original system logic and provided a minimum 20-year design life. Reusing existing fixings and interfaces reduced intrusive installation work, while comprehensive documentation and a defined spares strategy supported ongoing maintenance and future lifecycle management.

Addressing Ageing Infrastructure While Preserving Proven Performance

Delivering a Modern Solution Built on Proven Engineering Principles

The priority was to modernise without overcomplicating – delivering a system that feels familiar to operators but is built to perform reliably for decades to come.

Design Engineer, AMS Nuclear

Executing a Seamless Transition Through Structured Delivery

Strengthening Fleet-Wide Confidence Through Experience and Insight

AMS Nuclear Certifications

ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
Cyber Essentials