Project Overview

Client: EDF Energy – Hunterston B, Heysham 1, Dungeness B & Hinkley Point B

Type: Control & Instrumentation

Scope Of Supply: Site Survery, Optioneering, Prototyping, EMC Testing, Onsite Modifications

Key Deliverables: Optioneering reports, On-site Modifications

Electromagnetic interference (EMI) and radio frequency interference (RFI) present ongoing challenges for nuclear power stations, where maintaining the resilience of safety-critical control and instrumentation systems is essential. The challenge is strengthening electromagnetic protection across existing equipment without extensive modifications or disruption to plant operations.

AMS Nuclear delivers targeted shielding and bonding upgrades that improve system resilience, retain existing infrastructure and provide a practical, repeatable approach to meeting nuclear safety case requirements.

At Hinkley Point B (EDF Energy), AMS Nuclear delivered a three-phase programme of EMI/RFI resilience improvements across a range of safety-critical control cabinets and panels. The work included the design and installation of EMC shielding gaskets, enhanced earth bonding and laminated RFI shielding windows, supported by prototyping and laboratory type testing to EN 61000-4-3:2006+A2:2010 and relevant EDF requirements.

By adapting solutions to existing cabinet configurations and validating installation methods before deployment, AMS Nuclear provided a structured approach to improving electromagnetic resilience while minimising intrusive site work and supporting wider application across the AGR fleet.

The Challenge: Strengthening EMI/RFI Resilience

Designing a Practical, Compliant Solution

Phase 1 – Core Cabinet Upgrades

Phase 1A – Expanded Scope and Method Refinement

Phase 3 – Type Testing and Validation

Controlled Delivery Across the Project Lifecycle

Advancing EMI/RFI Resilience Across the Fleet