Electromagnetic interference (EMI) and radio frequency interference (RFI) present ongoing challenges for nuclear power stations, where maintaining the resilience of safety-critical control and instrumentation systems is essential. The challenge is strengthening electromagnetic protection across existing equipment without extensive modifications or disruption to plant operations.
AMS Nuclear delivers targeted shielding and bonding upgrades that improve system resilience, retain existing infrastructure and provide a practical, repeatable approach to meeting nuclear safety case requirements.
At Hinkley Point B (EDF Energy), AMS Nuclear delivered a three-phase programme of EMI/RFI resilience improvements across a range of safety-critical control cabinets and panels. The work included the design and installation of EMC shielding gaskets, enhanced earth bonding and laminated RFI shielding windows, supported by prototyping and laboratory type testing to EN 61000-4-3:2006+A2:2010 and relevant EDF requirements.
By adapting solutions to existing cabinet configurations and validating installation methods before deployment, AMS Nuclear provided a structured approach to improving electromagnetic resilience while minimising intrusive site work and supporting wider application across the AGR fleet.
The Challenge: Strengthening EMI/RFI Resilience
As part of the UK AGR fleet-wide EMI/RFI Safety Case programme, EDF identified a requirement to enhance the resilience of control system enclosures against electromagnetic interference hazards.
The existing infrastructure included legacy cabinet designs with foam-based gaskets and limited direct bonding between doors and enclosures. While functional, these arrangements did not fully align with evolving expectations for electromagnetic shielding performance.
The challenge was to deliver targeted, EMC compliant upgrades across a range of operational systems without introducing unnecessary complexity, downtime, or intrusive modifications. Solutions needed to be practical, repeatable and capable of integration within existing plant configurations.
Phase 1A – Expanded Scope and Method Refinement
Following initial deployment, AMS Nuclear extended the upgrade strategy to additional safety-critical systems, including:
- Guardline Cubicles
- Guardline Boiler Trip Units
- Quadrant Protection Equipment Panels
This phase introduced enhanced sealing and shielding solutions:
- Fully wrapped clip-on EMI shielding gaskets for improved durability and consistency
- Laminated RFI windows bonded using conductive tapes and silicone sealing techniques
- Supplementary conductive treatments applied to cable access points and interface surfaces