Project Overview

Client: EDF Energy – Hinkley Point B

Type: Obsolescence

Scope Of Supply: Design, Build, Test, Deliver

Key Deliverables: Replacement IFD Pneumatic Panel

Ageing pneumatic systems present an ongoing challenge for nuclear power stations, particularly where complex pipework arrangements and restricted access make maintenance and replacement difficult. The priority is not simply replacing ageing components, but delivering a reliable, maintainable solution that integrates with existing plant infrastructure while minimising installation complexity and operational disruption. AMS Nuclear provides a complete survey-to-manufacture service, combining detailed system investigation, bespoke engineering design and controlled manufacturing to deliver fully documented and factory-tested replacement systems.

At Hinkley Point B (EDF Energy), the pneumatic control cabinet serving the IFD operating cell contained ageing nylon pipework, with its complex configuration making individual pipework replacement impractical. Working with the station’s Fuel Route Improvement Team, AMS Nuclear developed a three-phase replacement programme, beginning with an investigative survey and P&ID development, followed by detailed mechanical and electrical design, and culminating in the manufacture and Factory Acceptance Testing of a bespoke pneumatic control panel. Incorporating stainless steel tubing, modern control components and comprehensive technical documentation, the replacement was engineered to address ageing-related reliability concerns, improve maintainability and support the continued operation of the IFD system.

Addressing Ageing Infrastructure Without Disrupting Operations

Engineering a Structured Solution Through a Three-Phase Programme

Phase 1: Building a Verified Engineering Baseline

“Before designing a replacement system, we needed a precise understanding of how the existing cabinet functioned. That survey work allowed us to design with confidence.”

Design Engineer, AMS Nuclear

Phase 2: Designing a Modern Pneumatic Control Panel

Phase 3: Precision Manufacture and Verified Performance

Delivering a Robust Solution for Long-Term Operation