AMS Nuclear Logo icon

Project Overview

Type: Obsolescence, C&I Reverse Engineering

Scope Of Supply: Design, Prototype, Manufacture, Test & Qualify (Reverse Engineering)

Market Sector: Nuclear Power Generation

Ageing electronic components present an ongoing obsolescence challenge for nuclear power stations, particularly where established monitoring systems must remain operational throughout extended plant lifecycles. The challenge is not simply replacing outdated technology, but maintaining proven functionality, compatibility with existing equipment and compliance with nuclear safety requirements while minimising modifications to plant infrastructure.

AMS Nuclear addresses these challenges through reverse engineering and bespoke electronic design, delivering modern, supportable replacements that extend equipment service life and provide a sustainable spares strategy. At EDF Energy’s Heysham 2 and Torness stations, the Spurious Ingress Detection System (SIDS) and Water Ingress Detection System (WIDS) relied on obsolete electronic modules originally supplied by Bestobel Mobrey.

AMS Nuclear developed and qualified replacement printed circuit boards (PCBs) for the controller and head amplifier modules, maintaining compatibility with the existing ultrasonic probes, housings and control interfaces. This approach restored long-term maintainability, supported continued operation of the Class 2 monitoring systems and avoided the extensive plant modifications associated with full system replacement.

Supporting Ageing Instrumentation in a Highly Regulated Environment

Engineering a Practical Path Through Obsolescence

“Our focus was to create a replacement that behaved exactly like the original system from the station’s perspective. By preserving the existing installation, we reduced both implementation risk and operational disruption.”

Senior Engineer, AMS Nuclear

Delivering a Qualified Replacement for Critical Plant Systems

Extending the Service Life of Critical Detection Systems

“Obsolescence doesn’t always require a full system replacement. Sometimes the best solution is understanding the original design deeply enough to rebuild it in a way that keeps the plant running safely for years to come.”

Project Manager, AMS Nuclear

AMS Nuclear Certifications

ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
Cyber Essentials